Plant Engineering
A Road Roller, a 36-Hour Deadline, and the Spec Sheet That Saved the Job
An Astec equipment distributor coordinator recounts a 36-hour road roller rush, a wholesale plate compactor order, and the 30-minute spec check that saved the job.